Requirement: Mechanisms and Algorithms

Critical Path Analysis

Purpose:

BP-Modelling Processing: Critical Path Specification

The system must enable specifying the most critical paths in the BP. The different path included within a BP instantiation will have different level of difficulty wrt their comprehension. Both the automatic generation procedure, and the simulation process must be aware of such an aspect.

Scope:

The scope of the implementation targets evaluation of the critical path by means of the path analysis algorithm of the simulation component.

Target System:
ADOxx 1.3UL1

Functional Requirements Specification:

The system shall provide an algorithm which analysis every path of a process and display the expectatin values and critical paths. 

Non-Functional Requirements Specification:

The system shall provide a trigger for the simulation algorithm and a GUI for the results. 

Средно (0 Гласове)
The average rating is 0.0 stars out of 5.
No comments yet. Be the first.